2 months ago
Ian and his crew tore out and repoured our driveway in two days. Clean lines, no cracking through a full winter. I would recommend River City Restoration to anyone.
Service
Tear-Out, Replacement and Decorative Finishes
A driveway is usually the largest single piece of concrete on a property and the first thing anyone sees. When it starts to spall, settle or hold water against the garage, patching stops being economical and replacement becomes the cheaper long-term answer.
River City Restoration handles the whole replacement: saw cutting, demolition, haul-off, base repair, forming, pouring and finishing. We grade every driveway and patio to shed water away from the foundation, which protects the structure you are standing on as much as the slab itself.
We finish in broom, exposed aggregate, stamped patterns and integral color. Ian will walk you through what each finish costs to maintain, not just what it costs to install, because a stamped patio that never gets resealed looks worse in five years than a broom finish that was left alone.

Most residential driveways are a two to three day install, followed by a cure period. Day one is demolition and haul-off, and it is also when we find out what is actually under the slab. Old driveways in this area frequently sit on fill that was never compacted, and pouring new concrete on top of that buys you the same failure a second time.
Day two is base work and forming. We bring the subgrade to the right elevation with compacted crushed stone, set the forms to a grade that drains, and place reinforcement. Day three is the pour and the finish.
After that, the slab needs time more than it needs anything from us. Stay off with vehicles for seven days. Do not use de-icing salt on it for the first full winter, because new concrete is at its most vulnerable to salt scaling in its first year. We leave you a written care sheet with all of it, and we come back to seal decorative work once the slab has cured.
Sometimes. An overlay needs a structurally sound slab underneath: no settlement, no working cracks, and a surface still bonded well enough to hold the new material. If the base has failed, an overlay is money spent twice. We will tell you which one you have.
Yes, in a range of stamp patterns and integral or broadcast colors. Decorative work needs resealing roughly every two to three years to keep its color, and we quote that maintenance up front so it is not a surprise later.
Plan on about ten days total: two to three days of work, then seven days before you park on it. We can usually stage the job to keep part of the drive usable, and a high-early mix can shorten the wait when parking on the street is not an option.
Reviews
Ian and his crew tore out and repoured our driveway in two days. Clean lines, no cracking through a full winter. I would recommend River City Restoration to anyone.
Ian and his team were awesome. They worked extremely hard from start to finish, and kept us updated and informed through the entire pour and cure.
We had settlement cracks running up the foundation wall. Ian explained exactly what was moving and why, carbon-fiber strapped it, and it has not budged since. Especially knowledgeable and trustworthy.
Response was incredible. The crew was amazing. Follow-up could not have been better. The epoxy floor in our shop still looks like the day it went down.
Ian does great work. Fast, knowledgeable, and he caught a drainage problem under our patio that nobody else spotted. Saved us a lot of time and money.
Answered the phone on a Saturday, was out Monday morning, and communicated nicely through the whole job. Guys were polite and explained every step. My garage slab is finally flat.
Free On-Site Estimate Within 48 Hours
Tell us what you are looking at and Ian will walk the job himself. Free on-site estimates across Greater Cincinnati and Northern Kentucky, booked within 48 hours.
(513) 290-8208